April 1925 Construction Queue

Total IBPs: 500 (5 Industry) + 10% (5 Economy) = 550

National Projects:

Air Tech 4 = 20 IBPs


Upgrading 2 25-40kT Slipways to 40-55kT capacity = 20 IBPs (Completion Date January 1927)


Infrastructure Upgrades - Northern Australia Rail lines = 10 IBPs


Upgrading 2 40-55kT Slipways to 55-70kT capacity = 30 IBPs (Completion Date April 1927)


Building new 55-70kT Slipway = 25 IBPs (Completion Date April 1927)


Future Investment Project = 10 IBPs

Total Cost: 115 IBPs


Army

10 Activations of Reserve Infantry Divisions for Regular service = 10 IBPs, complete in August 1925


Upgrading 3rd Australian Guards to Motorized Status = 10 IBPs, complete in February 1926, full effectiveness reduced until November 1926


5 Reserve Infantry Divisions = 10 IBPs (Cost Date Completed 1 February 1925, unit effectiveness full in 1 August 1926)


3 Motorized Infantry Divisions w/ Armored Recon Battalion = 36 IBPs (Cost Date completed February 1926, unit effectiveness 1 February 1927)


1 Motorized Artillery Brigade = 6 IBPs, complete in February 1926, max effectiveness in February 1927


Maintenance Costs:


270,000 Actives = 2.7 IBPs


2,970,000 Reservists = 5.94 IBPs

Total Cost: 80.64 IBPs


Navy

2 Henken-class (1,400t) = 0.14 IBPs (completion in March 1925)

3 L-class (2,000t) = 0.3 IBPs (completion in April 1925)


10 Nez Perce-class (14,300t) = 151.2 IBPs (construction phase complete June-August 1925, full completion in February-April of 1926)


6 1 Sovereign-class (50,428t) = 50.4 IBPs (construction phase complete in May of 1925, full completion in May 1926)


5 Sovereign-class (50,428t) = 12.6 IBPs (fitting out phase, completion in March-April 1926)


2 Defiant-class (53,348t) = 106.6 IBPs (construction phase complete in March 1927, full completion in March 1928)

Maintenance Costs:


1,508,800 tonnes = 15.08 IBPs


Total Cost: 320.88 IBPs

Air Force


4 prototype PF-4 biplane fighters = 4 IBPs (Completion July 1925)


4 prototype BF-3 biplane bombers = 4 IBPs (Completion July 1925)


40 PF-3 biplane fighters = 4 IBPs (Completion July 1925)


12 8 T-1 transport aircraft = 4 IBPs (completion July 1925)


20 10 RC-2 coastal patrol flying boats = 5 IBPs (completion July 1925)


Maintenance Costs:


192 Aircraft = 1.92 IBPs


Total Cost: 22.92 IBPs


Overall Expenditures: 539.44/550 IBPs

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.